Gold Member Since 2015
LEEDS INTERNATIONAL DEVELOPMENT CO., LIMITED

Car Care Equipment, Sanding Booth, Sanding Room manufacturer / supplier in China, offering Car Care Equipment/Sanding Booth (BD7200A), Auto Baking & Paint Booth with Heat Exchanger, Big Scissor Car Lift for Wheel Alignment and so on.

(/ )

Supplier Homepage Product spray booth car spray booth Car Care Equipment/Sanding Booth (BD7200A)

Car Care Equipment/Sanding Booth (BD7200A)

FOB Price: US $5,000 / Set
Min. Order: 1 Set
Min. Order FOB Price
1 Set US $5,000/ Set
Get Latest Price
Port: Huangpu, China
Production Capacity: 50 Sets Per Month
Payment Terms: L/C, T/T, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: BD7200A
  • Certification: CE, GS
  • Coating: Painting
  • Heating Mode: Diesel
  • Condition: New
  • Trademark: BYDE
  • Specification: 7m
  • HS Code: 8419899090
  • Type: Stainless Steel
  • Substrate: Steel
  • Airflow Direction: Fully Undershot-type
  • Paint Mist Treatment: Dry-type
  • Function: Polish or Sand The Paint on Car Body
  • Transport Package: Export Standard
  • Origin: Guangzhou China
Product Description
1. The garage equipment: Sanding room is one pretreatment equipment, which collect air, dust, waste etc. To keep clean working area.
2. CE standard, competitive price, famous brand.
3. OEM is available.
ModelBD7200A
Body sizeExternal size(mm)(L)8200×(W)3500×(H)3500
Internal size (mm)(L)7000×(W)3500×(H)2700
Basement boardLoad capacity650Kg/single wheel
Air discharge filter26 m²(full grid)
Metal Basement300mm
Ramp2pcs, each size: (L)2000×(W)620×(H)300mm
LightingTop lights8 units, each unit3×36w, total 864w
Lux550Lux
Filter systemPre-filterPlate filter, G3 grade
Top ceiling filterF5 grade fiberglass filter
Bottom floor filterG2 grade fiberglass filter
Ventilation systemBlower(direct drive)1×7.5Kw, 970r/min, 380V, 50Hz, CE
Air flow capacity25000m 3 /h
 One 7.5kw motor with big leaf fan, air capacity 25000 m 3 /h, abide by the standard of  JT/T324-2008; the cabinet is made up of double galvanized steel with heat insulator material inside.
Booth body1.The rear panel is 50mm thick EPS panel;
2.The front, left and right sides are PVC soft curtain, up and down are colorful,  middle is transparent.
3.Top panel is 0.6mm galvanized steel board, strengthen with square pipes.
4.The basement steel board is 300mm high.
Static pressure1.Galvanized steel with square pipes structure;
2.With hang ceiling or post supporting.
Lighting systemTop lights 8 units, each unit 3pcs 36W tubes,total864W.
Control SystemMain electrical components use domestic famous brand; with power switch, starter of fan ,stop button of fan, adjust switch for air damper ,light switch.
Waste Gas treatmentFiberglass filter cloth for filter
Other partsExhaust pipe: ducting 1piece, 90°elbow 1 piece.
FunctionPreparation Room is one pretreatment equipment , which collect air, dust, waste etc to keep clean working area .
Maintenance and repair
    Keep the booth and keep the intake and exhaust duct be openChange he top filter after painting 200sets of auto or use more than one year ,But in the more dust situation ,that should be shorten the filter changed period according to the actual condition.Change the Pre-filter after painting 200sets of auto or use more than one year .Change the floor filter after painting 200sets of auto or use more than one year .Clean the filter oil cup and fire nozzle of the burner each week ,keep the oil route be through.Add the diesel oil is forbidden when the burner is working .Make sure there are more than 5L oil in the oil tank ,use Non diesel oil is forbidden.Check the filter net of the active carbon environmental cabinet after painting 20sets of auto or use more than 1month .If the painting adhibit to the filter net fulled ,change the filter net in time and keep the ventilation be through.Check the heat exchanger every two months ,examine whether have the bad welded pheonomena,make sure safety engouth.Clean the dust adhered to the fans and blades semiyearly.When you don't operate the booth for a long periods,cut off the general power ,and open the door for ventilation every three days,in case accumulate the moisture air inside the booth .Change the heat exchanger and all of the electric wire when using more than 8 years.
Send your message to this supplier
Avatar
Miss Icy Li
Sales manager
*From:
To: Miss Icy Li
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now